ESC Engineering was engaged to prepare design documentation for the upgrade of the CCTV system at the Forrest Centre. The scope of works included the development of a single-line schematic illustrating the CCTV network topology, identifying core counts and key equipment locations.
The design package also comprised generic floor plans indicating typical camera locations, including lift lobbies and lift cars, as well as area-specific floor plans for nominated camera replacement and new installation locations such as the 219 Sports Deck and ground-level PTZ cameras. In addition, ESC prepared a detailed technical specification providing sufficient information to support the calling of competitive tenders for the works.