Curtin University CP306 – B408 Redevelopment

ESC Engineering was engaged to support the Curtin University CP306 – B408 Redevelopment, informed by the outcomes of a detailed Due Diligence Phase and the broader Strategic Space Planning (SSP) process. The redevelopment aims to address identified building defects and remediate both structural and non-structural compliance issues to achieve alignment with current NCC requirements.

The due diligence confirmed that the primary building structure, including beams and slabs, is suitable to support redevelopment; however, significant upgrades and
rectification works are required. These include full replacement of the glazed façade due to performance and compliance issues, structural rectification to address non-compliant construction elements—particularly connections to precast concrete façade panels—and upgrades to mechanical, vertical transportation, and electrical services. Many existing building services were identified as being at or beyond end of life, with early rectification works completed in February 2025 to address areas requiring immediate attention.